Mill the groove in the miter of the riser.
Transfer the centre of the milling to the workpiece.
Place the tread and transfer the marking.
Align the Zeta P2 with the marking and mill the groove.
To check, join the connection with the Bisco P-14 without glue.
Mark the staircase steps on the construction site and, where necessary, adapt them to the spatial situation in a user-friendly way.
Use the planing machine to adapt the components to the spatial situation.
Glue each element with the Tenso P-14 and stick to the substrate.
The folded plate staircase is finished.